Product Details:
|
Appliion: | E360LC | Size: | ROD*PISTON: 100*150MM |
---|---|---|---|
Advantage: | High And Low Temperature Resistance | Stock: | Abundant Inventory |
Product Features: | Reinforced Type, Pressure Resistant, Not Easy To Leak Oil | Packing: | Each Kit For Each Box Packing |
Material: | NBR, PU , PTFE | Condition: | New |
Highlight: | Bucket Cylinder Seal Kit 150MM,100MM*150MM Oil Resistant O Ring,E360LC JOHN DEERE seal kit |
JOHN DEERE Excavator Seal Kit E360LC Bucket Hydraulic Cylinder Seal Kit
Abnormality in seal
1. State: Deterioration (hardening, cracks)
Cause: 1. lncompatible with the oil used
2. degradation of the oil used
3. Abnormal rise of the oil temperature
4. Degradation from ozone
5. High-speed actuation (large heat generation)
Countermeasure: Change the seal material to one excellent in oil resistance, heat resistance, and weather resistance.
2. State: Swelling
Cause: 1. lncompatible with the oil used
2. Mixing of a foreign liquid such as cleaning solution
Countermeasure: Change seal material
3. State: Wear (mirror surface, striation, biased abrasion)
Cause:1. Excessive minimum pressure on the sliding surface
2. Long continuous pressure appliion time
3. Extremely short strokes
4. Excessive eccentricity (inappropriate bearing)
5. lnappropriate roughness of the contacting surface
6. lnsufficient lubriion ability of the oil used Countermeasuer for causes 1, 2, 3 : Change shape of the seal (for example, sharp lip-Rlip), Change seal material to one excellent in self-lubriion property.
Place of Origin:
|
Guangdong, China |
Condition: | New, 100%new |
Brand Name: | TOT |
Material: | Phenolic fabric,PU,NBR,FKM ,PTFE,POM ect |
Standard or Nonstandard: | Standard |
Color: | Black,white,brown,yellow |
Hardness: | 70~90 Shore |
MOQ: | 1 sets |
Feature: | Oil-resistant, heat resistant,Durable |
Certifiion: | ISO9001 |
Related brands:
|
Komatsu,Hitachi,Sumitomo,Doosan,Daewoo, Hyundai,erpillar, VOLVO,KATO,Liebherr , Mitsubishi and more. |
Appliion: | Energy & Mining, Construction works |
Supply Ability: | 2000 Piece/Pieces per Week |
Packaging : | PEbag for inner packing and carton for the outside packing |
Lead Time: | Within 7 days after after deposite |
Contact Person: Mr. Dong
Tel: +8618665709049